How Much Gravel for a Patio
Work out the gravel your patio base needs: measure the area, choose a compacted base depth, convert volume to cubic yards or tons, and order with a margin.
Contents
- Measure the patio area first
- Choose a base depth for the patio
- Calculate the gravel volume
- Turn volume into tons or cubic yards
- Work through patio sizes
- Lay the gravel in compacted layers
- Order gravel with a sensible margin
- Gravel Patio Questions
- How thick should a patio base be?
- How much gravel for a 20x20 patio?
- How much gravel for an 8x8 patio?
- How much gravel for a 10x10 patio?
- How much gravel for a 12x12 patio?
- How much crushed stone for a patio base?
To find how much gravel a patio needs, multiply the patio area by the depth of the compacted gravel layer, then convert that volume into cubic yards or tons. The depth you choose depends on the patio's use and on the material beneath it. Measure the area first and let the depth of the compacted layer drive the rest of the math.
- Multiply length by width to get the patio area in square feet.
- Depth is measured after compaction, so order loose gravel for the thicker layer it started as.
- Convert volume to cubic yards by dividing cubic feet by 27, or to tons with the supplier's figure per yard.
- Split the order into two layers so each one compacts properly.
- Add a margin to cover settling and uneven ground, then confirm the amount with the supplier.
Measure the patio area first
Patio area measurement is the starting number for every gravel calculation. Multiply the length by the width of the planned patio to get square footage. A rectangular patio of 10 by 10 feet gives 100 square feet, and a 12 by 12 patio gives 144 square feet.
Break a patio that is not a simple rectangle into smaller rectangles and add their areas. A curved or angled edge can be squared off with string lines and treated as a rectangle for ordering purposes. Slight oversizing protects the finished edges from crumbling.
Write the area down before touching the depth figures. The same area appears in every step that follows, so an error here carries through to the order. Measure again at the end and compare the two results.
Choose a base depth for the patio
A patio base thickness is chosen from the use of the patio and the ground beneath it, not from a single rule. A compacted gravel layer of about 4 inches suits a light patio on firm, well-drained soil. Heavier loads or soft ground call for a deeper sub-base layer, and a structural engineer can confirm the figure for demanding sites.
The gravel depth you enter into a calculation is the compacted layer depth. Loose gravel is ordered thicker because it shrinks as it is compacted. Your supplier can tell you the ratio for the crushed stone you buy.
The sand bedding depth sits above the gravel and holds the paving units. Sand is calculated separately from the base and should not be folded into the gravel volume. Keep the two materials on separate lines of your plan.
Calculate the gravel volume
Gravel volume is the patio area multiplied by the compacted base depth, with both figures in the same unit. Convert the depth from inches to feet by dividing by 12, then multiply by the square footage to get cubic feet. A 10 by 10 patio at 4 inches of base gives 100 square feet times 0.33 feet, or about 33 cubic feet.
A patio gravel volume calculator does the same arithmetic and removes conversion mistakes. Enter the length, width and depth, and the tool returns cubic feet, cubic yards or cubic metres. Check that the depth you enter is the compacted figure, not the loose one.
For larger patios, the cubic yard is the working unit. Dividing cubic feet by 27 converts the volume into cubic yards, and dividing by about 27 gives a close figure in cubic metres. Both units help you talk to a supplier in the numbers they sell.
Turn volume into tons or cubic yards
Gravel is sold by volume or by weight, and the two are linked by the density of the stone. Crushed stone has a density that varies with the rock type and the size of the pieces. Ask the supplier for the weight of one cubic yard of the stone you intend to buy.
Tons of gravel follow from that figure: multiply the cubic yards by the weight per yard. The tonne, used in metric settings, is close to but not equal to the ton, so state which unit you mean. A supplier's own conversion table is the safest source for an order.
Buying by weight is exact for a large load, while buying by volume is easier to check against your calculation. Either way, keep the volume figure at hand so you can compare quotes. Note the density figure you used, and your order becomes repeatable.
Work through patio sizes
Small patios show how the numbers scale. A patio of 8 by 8 feet covers 64 square feet, and a gravel base of 4 inches needs a little over 21 cubic feet of compacted material. The same depth over a 10 by 10 patio calls for about 33 cubic feet.
A 12 by 12 patio brings the area to 144 square feet and the volume to about 48 cubic feet at that depth. A patio of 20 by 20 feet reaches 400 square feet and roughly 133 cubic feet. Increase the depth for soft ground and the volume rises in step with it.
These figures describe the compacted gravel only, before any allowance for loose material or waste. A 20 by 20 patio is large enough that the delivery method matters as much as the volume. Plan where the pile will sit and how the stone will reach the patio.
Lay the gravel in compacted layers
A compacted gravel layer compacts properly only when it is placed in lifts of limited thickness. Thick single pours trap loose stone at the bottom and settle later under the patio. Split the total depth into two or more lifts and compact each one before adding the next.
Moisten the stone lightly before compaction and work across the whole area in passes. A plate compactor suits a patio, while a heavy roller belongs to larger jobs. The finished surface should be flat, firm and at the planned level.
Compaction is the reason the ordered volume differs from the finished thickness. Track the depth of loose stone you spread against the target, and the calculation and the site stay in agreement.
Order gravel with a sensible margin
Order a margin above the calculated volume to cover settling and uneven subgrade. The size of the margin depends on how level the ground is and how much stone is lost in handling. Agree a figure with the supplier rather than guessing at the counter.
Delivery changes the plan as much as the quantity. A full load dropped at the curb must be moved to the patio, and that work adds time. Small patios can often be served by bagged stone, while large volumes arrive loose.
Confirm the unit, the density figure and the delivery conditions in writing before paying. Check the load on arrival against the ticket. Keep a little stone back for topping up the edges after the paving is laid.
Gravel Patio Questions
How thick should a patio base be?
A patio base of about 4 inches of compacted gravel suits light use on firm, drained ground. Soft soil or heavier loads call for a deeper base, and a structural specialist can set the figure for your site. The depth that matters is the compacted one, so order stone for the loose depth it starts from.
How much gravel for a 20x20 patio?
A patio of 20 by 20 feet covers 400 square feet, and a 4 inch compacted base needs about 133 cubic feet of gravel. That converts to roughly 5 cubic yards. A deeper base raises the volume in proportion, so confirm the depth before ordering.
How much gravel for an 8x8 patio?
An 8 by 8 patio covers 64 square feet, and a 4 inch base needs a little over 21 cubic feet of compacted gravel. That is under one cubic yard. Order a margin above the figure to cover settling and uneven ground.
How much gravel for a 10x10 patio?
A 10 by 10 patio covers 100 square feet, and a 4 inch compacted base needs about 33 cubic feet of gravel. That is a little more than one cubic yard. Use the density figure from your supplier to turn the volume into tons.
How much gravel for a 12x12 patio?
A 12 by 12 patio covers 144 square feet, and a 4 inch base needs about 48 cubic feet of compacted gravel. That is under two cubic yards. Lay the stone in two lifts so each layer compacts fully.
How much crushed stone for a patio base?
Crushed stone for a patio base is calculated as area times compacted depth. A patio of 100 square feet at 4 inches needs about 33 cubic feet of compacted stone. Convert that to cubic yards or tons with the supplier's density figure before ordering.