New Construction Home Inspection and Final Walkthrough Checklist

A practical new construction home inspection checklist covering the builder walkthrough, snagging list, doors and windows, fixtures and finishes, and how to plan packing, unpacking and small spaces around the results.

15 min read8 viewsNew Construction Home Inspection and Final Walkthrough Checklist
— · 0 votes
Contents
  1. What is a new build home inspection checklist?
  2. When should you inspect a new construction home?
  3. How to prioritise what you check
  4. New construction home inspection checklist by area
  5. Exterior, entrance and shared areas
  6. Doors and windows
  7. Electrical, heating, plumbing and ventilation
  8. Kitchen and bathrooms: fixtures and finishes
  9. Walls, ceilings and floors
  10. Balcony, patio or small outdoor space
  11. How to run the final walkthrough step by step
  12. How to write a snagging list the builder will act on
  13. Making a printable checklist or new construction home inspection checklist PDF
  14. How the inspection should shape your move
  15. Measure while the home is empty
  16. Sort and pack around the snagging list
  17. Plan the unpacking order
  18. Giving compact areas and the balcony a clear purpose
  19. Choosing a purpose for each small space
  20. Balcony checks before you furnish it
  21. Examples for different budgets and needs
  22. Common mistakes during a new home final inspection
  23. Your next steps

A new construction home inspection checklist is a room-by-room list you use to find defects, unfinished work and missing items in a newly built home before you accept the keys, and again before your warranty period ends. The most important use is the final walkthrough with the builder, because issues are easiest to get fixed before closing. A good checklist covers safety first (electrics, gas, smoke alarms, stairs, railings), then function (doors and windows, plumbing, heating, appliances), then finish (paint, flooring, grout, scratches). It ends with a written snagging list that you and the builder both agree on.

The walkthrough also shapes your move. What you find tells you which rooms you can unpack straight away, which ones to keep clear for repair work, and how to use a small home and its balcony from day one.

What is a new build home inspection checklist?

A new build home inspection checklist is a structured list of things to test, look at and record in a newly built house or apartment. It is different from a checklist for an older home. In a new build you are not looking for wear and age. You are looking for workmanship faults, incomplete installation, damage caused during construction, and differences from what your contract and chosen specification promised.

Three types of check are often confused:

  • Building authority inspections are carried out by local officials to confirm the home meets minimum code or regulation requirements. Passing them does not mean the finish quality is what you paid for.
  • Independent home inspections are done by a professional inspector you hire. Whether and when they can access the site depends on your contract and the builder's policy, so confirm this in writing early.
  • The builder walkthrough (also called a pre-closing, orientation or final walkthrough) is where you and the builder's representative go through the home together and record items to fix.

Your own checklist supports all three. You bring it to the walkthrough, compare it with any inspector's report, and use it to track repairs.

When should you inspect a new construction home?

The most useful times to inspect a new construction home are before walls are closed, just before closing or handover, and before the builder's warranty or defects period expires. Not every buyer can use all three stages. The final walkthrough is the one almost every buyer gets and should never skip.

StageWhen it happensWhat it can catchTrade-off
Pre-drywall (pre-plasterboard)After framing, wiring and plumbing are in, before walls are coveredFraming problems, missing insulation, poorly fixed pipes or cables, missing blocking for wall-mounted itemsNot always permitted. Only possible if you bought before construction finished.
Final walkthrough / new home final inspectionShortly before closing or key handoverUnfinished work, damage, faulty fixtures and finishes, appliances that don't work, missing itemsTime is usually limited, and the home may still be dusty or mid-clean.
Pre-warranty-expiry checkBefore the end of the warranty or defects period stated in your documentsIssues that appear with use: settling cracks, sticking doors, leaks, heating or ventilation faultsYou must already be living there, so repairs happen around your furniture and routine.

Warranty lengths and what they cover vary by builder, country and type of defect. Read your own documents and note the exact end date in your calendar the week you move in.

How to prioritise what you check

Check in order of consequence: safety, then water and weather, then function, then appearance. This order matters because walkthrough time is limited. If you spend 40 minutes on paint touch-ups, you may run out of time before testing the boiler or the balcony drain.

  1. Safety: smoke and carbon monoxide alarms, electrical outlets and switches, gas appliances, stair handrails, balcony and window guarding, secure entry door locks.
  2. Water and weather: leaks under sinks, around toilets and showers, signs of damp, window and door seals, roof and gutters (from the ground), drainage away from the building.
  3. Function: every door, window, tap, drain, appliance, heating and cooling control, ventilation fan, and light.
  4. Finish: paint, flooring, worktops, tiles and grout, trim, scratches, chips and alignment.

Appearance items still matter, and you should record them. Just don't let them crowd out the checks that protect your safety and your belongings.

New construction home inspection checklist by area

The checklist below is grouped by area so you can move through the home in one direction without doubling back. Adapt it to your layout. A studio apartment will skip some sections. A house with a garden will add others.

Exterior, entrance and shared areas

  • Ground slopes away from the building, with no pooling near walls.
  • Gutters and downpipes are attached and discharge away from foundations.
  • Brickwork, render or cladding shows no large cracks, gaps or missing sections.
  • Outdoor taps, lights and outlets work.
  • Paths, steps and driveway are complete, level and free of trip edges.
  • For apartments: front door closes and locks properly, entry system or intercom works, mailbox and storage or bike space are allocated as agreed.

Doors and windows

  • Every door opens and closes without catching, swinging open on its own or leaving uneven gaps.
  • Locks, handles and latches work. You have all keys, fobs and codes listed in your contract.
  • Windows open, close, lock and tilt (if designed to) smoothly.
  • Seals are continuous, with no visible gaps or daylight around frames.
  • Glass is free of cracks, scratches and leftover stickers or labels that hide damage.
  • Window restrictors or child-safety locks are fitted where required or promised.
  • Sliding doors to the balcony or patio run smoothly and lock securely.

Electrical, heating, plumbing and ventilation

  • Test every outlet with a phone charger or small plug-in tester.
  • Every switch controls the correct light. Note any switch that does nothing.
  • The consumer unit or breaker panel is labelled clearly.
  • Smoke and carbon monoxide alarms are installed where specified and respond to their test buttons.
  • The heating system turns on and reaches temperature. Radiators or vents in each room warm up.
  • Hot water reaches every tap within a reasonable time.
  • Extractor fans in the kitchen and bathrooms run and actually pull air (hold a sheet of toilet paper near the grille).
  • You know where the water shut-off, gas shut-off and electrical isolators are.

Kitchen and bathrooms: fixtures and finishes

  • Run every tap for at least a minute and check underneath for drips.
  • Fill and drain each sink, basin and bath. Look for slow drainage or gurgling.
  • Flush each toilet and check it refills and stops.
  • Shower screens and doors seal, and silicone is complete with no gaps.
  • Tiles are level, with no cracks or hollow-sounding sections and no missing grout.
  • Cabinet doors and drawers align, close fully and have all handles.
  • Worktops have no chips, burns or unsealed joints.
  • Every appliance powers on: oven, hob, extractor, fridge, dishwasher, washing machine. Check that models match what you selected.

Walls, ceilings and floors

  • Paint is complete, with no patches, drips or exposed filler.
  • No cracks beyond fine hairline marks. Record any that are wider, or that run diagonally from door and window corners.
  • Ceilings show no stains that could indicate a leak.
  • Floors are level to the eye, with no squeaks, lifting edges, gaps or scratches.
  • Skirting boards and trim are fixed and finished at the joints.
  • Built-in storage is installed as specified, with shelves, rails and doors in place.

Balcony, patio or small outdoor space

  • Railings and balustrades are firm, with no movement when pushed.
  • The floor slopes towards a drain, and the drain is clear of building debris.
  • The threshold between inside and outside is sealed, with no gaps where water could enter.
  • Any outdoor light or outlet works.
  • You have the builder's or building management's guidance on what you may attach, hang or place on the balcony, including any load or fixing restrictions.

How to run the final walkthrough step by step

The builder walkthrough works best when you treat it as a structured appointment with a clear output: a signed or acknowledged list of items to fix and agreed timeframes.

  1. Confirm the details in advance. Ask how long the walkthrough will last, who will attend, whether you can bring an inspector or a second person, and whether utilities will be switched on. Without power and water you cannot test function.
  2. Pack a small kit. Bring your printed checklist, a pen, a phone with a charged battery, a plug-in charger or outlet tester, painter's tape or small removable stickers, a torch and a tape measure.
  3. Start outside, then work top to bottom, room by room. Walking the same route every time reduces missed rooms.
  4. Test before you look. In each room, operate everything first (switches, outlets, taps, doors, windows, appliances), then look at surfaces.
  5. Mark and photograph each issue. Put a small piece of tape on the defect, take one wide photo showing location and one close-up, and write it on your list straight away.
  6. Agree the list before you leave. Go through each item with the builder's representative and ask them to confirm it in writing, whether on their form, yours, or by email the same day.
  7. Ask about timing. Find out which items will be fixed before handover and which afterwards, and get a contact for follow-up.
  8. Re-check before closing if possible. If repairs were promised before handover, ask for a short re-inspection to confirm they were done.

How to write a snagging list the builder will act on

A snagging list is a written record of every defect, unfinished item or damage found in a new home, with enough detail that someone who wasn't there can find and fix each one. Vague entries such as kitchen needs work tend to get vague results.

Each entry should include:

  • Location: room plus position, for example bedroom 2, wall opposite the window, about 1 metre from the left corner.
  • Description: what is wrong, in plain words.
  • Category: safety, water, function or finish, so urgent items stand out.
  • Photo reference: the file name or number of the matching photo.
  • Status: open, scheduled, fixed and confirmed.
No.LocationIssueCategoryStatus
1Bathroom, under basinSlow drip from waste pipe jointWaterOpen
2Living room, balcony doorLock does not engage fullySafetyOpen
3Hallway, left wall near entrancePaint scuffed, area about the size of a handFinishOpen

Keep one master copy and update it as items are fixed. When a repair is done, check it yourself before marking it closed.

Making a printable checklist or new construction home inspection checklist PDF

A printable checklist or PDF version of your new construction home inspection checklist is worth preparing before the walkthrough, because you will be moving quickly and writing by hand in a home with no furniture to lean on.

To build your own:

  1. Copy the area-by-area lists above into a document.
  2. Give each room its own page, in the order you will walk the home.
  3. Add three columns beside each item: OK, Issue, Photo number.
  4. Leave several blank lines at the end of every room for unexpected items.
  5. Add a final page for the snagging list table, plus space for the date, attendees and agreed timeframes.
  6. Save or export it as a PDF so it prints consistently, and keep a copy on your phone.

Paper versus phone is a real trade-off. Paper is faster for ticking and easier to show the builder. A phone keeps photos and notes together but is slower to type on. Many people print the checklist and use the phone only for photos, then type up the final snagging list that evening while details are fresh.

How the inspection should shape your move

Your walkthrough results tell you which parts of the home are ready to use and which are not. Planning your packing and unpacking around them avoids moving boxes twice and blocking access for repair workers.

Measure while the home is empty

The final walkthrough may be your last chance to see the rooms completely empty, so use a few minutes to measure what matters for a small home:

  • Door widths and the turning space in hallways and stairs, to confirm larger furniture will fit through.
  • Alcoves, wall lengths between doors and windows, and the space under stairs.
  • Window sizes, for blinds or curtains.
  • Balcony depth and width, so you know what furniture or storage it can hold.
  • Positions of outlets, so you place desks, beds and lamps where power actually is.

Write these on the room pages of your checklist. Measured figures are what stop you buying furniture or storage that doesn't fit.

Sort and pack around the snagging list

  • Pack by destination room, not by item type. Label each box with the room name used on your checklist so movers can place boxes correctly.
  • Hold back items for rooms with open repairs. If the bathroom tiling or a bedroom window is being fixed, stack those boxes in a ready room or keep them in one corner away from the work area.
  • Pack an essentials box with basic tools, cleaning supplies, toilet paper, chargers, a kettle or cup, medications, bedding for the first night and your printed snagging list.
  • Declutter before packing, not after. In a small home, every item you move needs a place. Sell, donate or discard things you wouldn't buy again, especially bulky items without a clear spot on your floor plan.

Plan the unpacking order

  1. Bathroom and sleeping area first, provided their checklist items are resolved. Rest and hygiene make every other task easier.
  2. Kitchen basics next: a small set of dishes, one pan and everyday food. Leave rarely used kitchen items boxed for a week while you learn the storage.
  3. Clothes and work items, so daily routines run normally.
  4. Rooms with completed repairs as they are signed off.
  5. Decorative items last, after you have lived in the space and know where things belong.

Avoid drilling, wall-mounting or fixing furniture to walls near any open snagging item. You don't want your own work to make it unclear who is responsible for a defect.

Giving compact areas and the balcony a clear purpose

In a small new home, each compact area works best when it has one main job, decided before you unpack. Without a defined purpose, spare corners and balconies often become storage for unopened boxes.

Choosing a purpose for each small space

  • Entry or hallway: a drop zone for keys, bags and shoes. A narrow shelf or a few hooks may be enough.
  • Alcove or corner: a compact desk, a reading chair, or closed storage. Choose one, based on what your daily routine actually needs.
  • Space under stairs or a deep cupboard: cleaning equipment, a vacuum, or seasonal items.
  • Balcony: a place for morning coffee, drying laundry, a few container plants, or weatherproof storage. Pick the main use first, then add a secondary one only if it doesn't get in the way.

Balcony checks before you furnish it

Before setting up a balcony, confirm the points from your walkthrough. The drain must be clear and the railings secure, and you must understand any building rules on what you can attach, hang or place there. Keep the drain free of pots and mats so water can escape. Heavy planters, storage units and screens may be restricted in some buildings, so check the guidance you received rather than assuming.

Examples for different budgets and needs

BudgetBalcony exampleCompact interior example
MinimalOne folding chair you already own and a single herb pot away from the drainReuse existing boxes or baskets as labelled storage in a cupboard; adhesive hooks in the entry where permitted
ModerateFolding bistro table and two chairs that can be stored indoors in bad weatherA narrow shelving unit sized to your measured alcove; under-bed storage containers
HigherWeatherproof bench with internal storage, plus outdoor lighting if an outlet existsMade-to-measure shelving or a wall-mounted fold-down desk, installed after relevant snagging items are closed

The trade-off at every budget is flexibility versus permanence. Folding and freestanding pieces cost less and can move with you. Fitted solutions use space more efficiently but need accurate measurements and a finished wall.

Common mistakes during a new home final inspection

  • Assuming new means perfect. Even well-built homes usually have items to fix. Finding them is normal and expected.
  • Relying on verbal promises. If a repair is agreed, make sure it appears in writing.
  • Skipping function tests. Looking at a tap is not the same as running it and checking underneath.
  • Inspecting with utilities off. Without water and power you cannot confirm the plumbing, heating or appliances work.
  • Moving furniture in front of defects. This makes repairs harder and can lead to disputes about damage.
  • Forgetting the warranty deadline. Problems that appear after you move in still need to be reported within the period stated in your documents.
  • Buying furniture before measuring. In a small home, a few centimetres can decide whether a piece fits.
  • Letting the balcony become box storage. Decide its purpose before move-in day and keep boxes indoors.

Your next steps

  1. Confirm the date, length and attendees of your builder walkthrough, and check that utilities will be on.
  2. Prepare your printable checklist, room by room, with a snagging list page.
  3. On the day, test function first, then finish, and photograph and record every issue.
  4. Get the snagging list confirmed in writing, along with repair timeframes.
  5. Measure key spaces while the home is empty, including the balcony.
  6. Pack by room, holding back items for areas with open repairs.
  7. Unpack in priority order and give each compact area, including the balcony, one clear purpose.
  8. Put your warranty end date in your calendar and schedule a final check before it.

Read next

Latest articles